Eero Paski
0400 265 419

Kari Töyli
+358 50 413 0338

Kari Töyli
+358 50 413 0338

Knud E. L. Knudsen
+49 7042 814297-25

Indrek Reimann
+372 50 89 404

Viitalantie 80
60640 Isokoski
(Seinäjoki)

Viitalantie 80
FI-60640 Isokoski
Finland

Viitalantie 80
FI-60640 Isokoski
Finnland

Viitalantie 80
FI-60640 Isokoski
Soome

Viitalantie 80
FI-60640 Isokoski
Finland

Screening Bucket for Heavy Use

MultaVEX Vibra

 

MultaVEX Vibra Screening Bucket

Simple structure and reliable operating principle: a direct driven camshaft which moves the bars in the bottom of the screening bucket at a different pace.

The screening size can be adjusted from 25 mm to larger sizes in just a few minutes.

The operating costs are very small compared to other screening buckets.

Depending on the model, the bucket requires only 20-80 litres of hydraulic flow with 160 bar pressure → it can be used also in tilt rotators.

Frame material made of wear-resistant 400HB steel.

All buckets are also available as so called Super models, which are equipped with teeth and reinforcements.

 

Areas of use:

  • Making of forest roads
  • Filling pipelines and cable lines
  • Screening gravel and crushed stone, even if it contains large pieces
  • Screening almost any material in construction sites → huge savings in landfill fees.

 

 

MultaVEX Vibra screening bucket is patented.
(FI 123997, FI 124431, FI 125679, US 9,546,467 B2, PCT/FI2013/050942, PCT/FI2014/050048, EP 20130843101, EP2903754, EP2951358)

More detailed information in the MultaVEX Vibra broschure

Bucket sizes

Model Capacity Width Weight Machine Size
3-6 210 l 83 cm 310 kg 3-6 ton
5-10 370 l 100 cm 520 kg 5-10 ton
10-15 620 l 120 cm 900 kg 10-15 ton
13-18 730 l 140 cm 1000 kg 13-18 ton
15-25 1200 l 150 cm 1440 kg 15-25 ton
25-35 1200 l 150 cm 1760 kg 25-35 ton

Example of savings made with a screening bucket

Building site preparation without a screening bucket

Transportation of miscellaneous land to a landfill site:
1 m³ = 1,6 ton
100m³ x 1.6 ton/m³ x 50 €/ton = 8000 €
Transportation 8 loads x 70 €/load = 560 €

Bringing fill and topsoil to replacement:
Fill 80 ton x 4 €/ton = 320 €
Topsoil 80 ton x 20 €/ton = 1600 €
Transportation 4 loads x 70 €/load = 280 €
Excavator work 8 h x 60 €/h =  480 €

Total costs: 11 240 €

Building site preparation with a screening bucket

Screening of miscellaneous land at the site:
Transportation of sorted stumps from the site 70 €
Transportation of sorted large stones from the site 70 €
Excavator work 8 h x 60 €/h = 480 €

Total costs: 620 €

SAVING: 10 620 €
All prices VAT 0, prices checked 12.11.2015.